I offer proactive assistance for owners, developers and professionals to know more about earthquake resistance. I have been designing buildings for earthquake resistance before my graduation. The requirements of the house and plot shape may govern various geometrical orders so it is best advised to consult qualified structural engineers.

The primary factor to be kept in mind is to make the building symmetrical and have at least a 3×3 grid keeping the middle somewhat more. L-shaped columns (fabricated casts) on the corners make the structure economical. The size of columns may be slightly more in lower floors.

Relevance of plinth beams is important since it holds the structure.

Walls should have beams every 4-6 times it’s thickness. This holds the masonry.

Deep beams are economical & bond with columns. The roof slab should be a bit arched or cambered one. Suitable scaffolding is available in local building centres like TERI.

In high rise buildings, stilts should be 25% thicker.

UncategorizedApril 10, 2008 9:55 pm

Future is not what we empower, it is what we really dream. And direct communication channels.

Our roads are like our nerves, so let’s make them smooth like a river. Let’s make them moving-Much like our conveyors and let them stop naturally like in a portal. Won’t it save fuel? On segregation portal, we need to work hard on comforting defined level of commuters like the above. This can be started by designing nodes.

Let these accelerate & brake in the physics governs us: Distance vs displacement:Speed vs velocity. What for we commute has to be understood in depth, it maybe a emergency or just a cool holiday. Much like the curves we design & program.

Coming to where these transit zones are located. Obviously on connected crests-no farms, no floods and better interconnectivity. Orient these avoiding head on sun making the solar collection on greater area.

Uncategorized 9:44 pm

We create projects after discovering needs unknown to you

Spend life: Don’t try to buy it. (Except from God)

Winners do same things differently. Losers indifferently

Where there is a resolution there are many ways and shortcuts for beeline strategies

When in home don’t fight with the pop

Experiences create books

Unknowingness & manipulation cause confusion

Strike the iron when it is hot and don’t let sparks injure

Silent constraints are the most dangerous ones

It’s better to be simply bad beforehand than to let things take a complicating worse turn.

A well-thought sketch is better than a revised drawing.

Enable us to serve you faster.

Let’s talk clearly. Unclear can be nuclear.

It’s worst when you are a loser but fail to accept it.

 

Uncategorized 9:03 pm

I want to visualize India as a maze-matrix of real superhighways, soft skylines, climatic, energy saving and eco friendly habitations where there is qualitative living, a uniform transitory national bylaw responsive to latitude, altitude and other geographical constraints. Even the slum structures look good. I feel if I can contribute my mettle and energy to make our India the top in this world only then my lease of life be successful. Our lives should be simplified-not complicated.

Uncategorized 9:03 pm

We do not create gothams
We do not sing money’s secrets

You can think of man days we put in
Flying like a sea gull on the shore

Take two somersaults
Then dive into hard dash wells

Ship is single
Deeps mingle

We think 3D
That’s our success CeeDee
I learnt maths (T/R)

Uncategorized 1:41 pm

1. Pre-Requisites-

a) Contractor- Availability on phone. Good labor management, flow monitoring, relay, anticipating materials week beforehand. Co-operative slab subcontractor.

b) Essentials- Give week’s commencement notice to authorities. Ensure site cleaning. Temporary Water Connection for soft soil. Electrical Connection for wood, water pump and night work. Reserve water tank. Temporary Store Raw material area & mortar platform at optimum work flow & secure place.

c) Documents- Copy of permit drawing, letter, working drawings, site order book, bill folder packet, pen, pencil, sharpener, eraser, stapler, staples, tape and 3’ plastic laminate roll, on caretaker’s responsibility.
d) Material Reqd-2000 Bks (recoverable), iron door, lock+3 keys & 4 steel sheets/angles/bolts. Flex pipe, tap, nipple & motor tanker, if no water.

2. Works till DPC Stage-

a) Excavated Volume-Stable pegs (temp bk piers+mud mortar-2′ away) confirms PL per WD.

b) Contractor marks notched CL for wall foundation(red) & column footing(white). Materials-Colors/lime/stone dust/brick dust, Peg/12mm bar & spade.

c) II Lines to CL to accommodate width of above as per WD.

d) Excavation-Use excavator for bulk & ensure safe stacking. Tarpaulin cover for rains.

e) Leveling-Define the leveling plane by mortar-lining and blue string line to relate with depth.

f) Boring small holes with bar, pesticides are poured and layer of specified sand is covered in all.

e) PCC auto-mixed is to be laid and rammed/compacted. Checked with plumb & tape.

g) On proper footing mesh (and pedestal) of steel bars, L bars are laid on columns tied by double wire. Should be vertical and cater to specified cover. Alternate laps follow.

h) Brickwork-staggered tapering on top, ensure level in brickwork. Ensure size to apply for DPC.

i) Backfill soil in specified compacted layers below top header course.

j) Pipes stacks erected before construction. Plinth beam & DPC be followed as per specification.

2. Works in Superstructure-

a) Siphon leveled and aligned joinery embedded & pest-proofed in course before brickwork is must.

b) Walls and columns should be checked in plumb line. Brick work should not have vertically continuing joint over joint.

c) Continuous curing is a must at any cost.

d) Junctions should be gripped as per detail.

e) Last course/layer is specialized.

3. Pre-Roof Laying

a) Shuttering should be placed, tied and leveled properly on compacted ground

d) It takes a week (+21 days) to lay well placed reinforcement. Ensure your shuttering fellow.

e) He should have additional planks for mortar platform at top

f) Before laying slab mesh, get checked location of electrical boxes, form work & beams.

g) The peripheral slab mesh would be cranked higher. It is never flat.

h) Ensure the specified additives to strengthen the roof.

4. Roof Slab Casting.

a) Less water and sand. General ratio should be 1:2:4.

b) Vibrator is a must everywhere in 1′.

c) Cold water for 7 days is a must.

5. Pre-Plastering-

a) Ensure all conduits & pipes in place in wall and columned tucked.

b) Ensure watering immediately before plaster.

c) Try getting done scraped rough plaster to tile bathrooms, kitchens and facades first.

d) Get all the plaster checked through professional.

6 Pre-Flooring

a) Ensure proper ramming, and leveling of floor base.

b) To avoid termites put more sand adjoining the walls etc.